conditions_for_ww_01

Conditions for applying the Wait and Weight Method 

Considerations about this well control method

What is the your opinion about?

Did you like our content?

– Like it ❤️

– Follow Us!

– Share your experience with your friends!

Thanks

Example performed in App “Drilling Simulator 3” for iPhone and iPad

Directional Well :
MD/TVD: 12000/8015 ft,
Liner Shoe Depth: 6500/6261 ft,
Kill Mud Volume to prepare: 812 bbl

(Note: In this example was considered that all KMW volume was ready to start the Wait and Weight Method) 

 

conditions_for_ww_02

conditions_for_ww_03

conditions_for_ww_04

conditions_for_ww_05

ww_vert_dir_10

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s