Drilling Hydraulics for iPad
New in release 1.3:
1) Fixing some issues with well configuration;
2) Improved performance;
3) Fixed the buoyancy factor calculations;
4) Fixed the formation temperature calculations for floating rig;
5) Fixed some issues with unit system;
contact@wellcontrol.com.br
Leave a Reply