Page 2 of 21
Kick Game 2
A Well Control Simulator
with Score like a game
App for iPhone and iPad
Challenge your friends in Oil & Gas schools or in Oilfield !!
Visit our Portfolio on the App Store
for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
Visit our website for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
Kick Tolerance as Maximum Kick Volume
Kick Tolerance as Maximum Kick Volum
Visit our Portfolio on the App Store
for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
Visit our website for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
Drilling Simulator 3 – New Update 2.0
App designed for both iPhone and iPad
New Version 2.0 coming soon on the App Store !!!
Drilling Simulator 1:
– Drilling on vertical well, kick detection, shut-in, stabilisation of pressures (sidpp, sicp, kick volume), save to iCloud to import from other app “Well Control Simulator”.
Drilling Simulator 2:
all of drilling simulator 1 PLUS Direcional and horizontal wells, well control using 01 choke and 01 single kick bubble on borehole and graphical analysis.
Drilling Simulator 3 (This App)
all of drilling simulator 2 PLUS:
1 – until 03 single kick bubbles on the borehole simultaneously
2 – standpipe manifold and choke manifold with 02 chokes and straight through
3 – Complications: failures schedule with Random option:
– Mud Pumps 1 and 2 “power end failure” or “fluid end failure”,
– Chokes 1 and 2 “plugged” or “washed”,
– One Drill Bit Nozzle “plugged” or “washed”
———-
New in the next update (version 2.0 – Coming soon):
– Improved circulation options with subsea valves upper kill & lower kill & upper choke
– On subsea wells, now it is possible to circulate kill mud in the kill line & riser after filling choke line with kill mud weight, keeping bop closed.
– On surface wells, added upper kill line, upper choke and a check valve in kill line
– improved visual of the gauges.
iPad screenshots:
SURFACE WELL: DRILLING
SUBSEA WELL: WELL CONTROL APPLYING THE DRILLER’S METHOD, WITH COMPLICATIONS:
SUBSEA WELL: CIRCULATING KILL MUD IN THE KILL LINE WITH RETURN TO RISER, KEEPING BOP CLOSED:
SUBSEA WELL: CIRCULATION COMPLETE WITH KILL MUD IN THE RISER AND BOP OPEN:
Visit our Portfolio on the App Store
for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
Visit our website for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
Wait and Weight method on Directional Wells
Wait and Weight method on Directional Wells
During drilling operations on oil wells, there may to occur the inflow of formation fluids into the well, which is an undesirable condition. The driller should detect such events and shut-in the well immediately and to record informations corresponding to stabilization of pressures SIDPP (Shut-in Drillpipe Pressure) and SICP (Shut-in Casing Pressure) and the volume gain.
There are two methods more used to well control when the drill string (drill bit) is in the bottom of borehole (normally on drilling when reaches a formation with pressure bigger relative to the bottom hole pressure): The Driller’s Method and the Wait and Weight Method (also named Engineer ‘s Method).
The Driller’s Method is performed with two circulations. The first circulation with the original fluid to circulate the influx out of well and the second circulation to fill the borehole with a new fluid. This method can be started immediately after shut-in the well.
The Wait and Weight Method is performed just with a single circulation with the new fluid, but is necessary to wait a lag time until to prepare the new fluid to start the method.
The choice of the method
The choice between these two methods is a controversial question among professionals of oil & gas, but if the rig has already the new fluid available to control the well (the hydrostatic pressure of the new fluid is equivalent to the formation pressure), the Wait and Weight method is aplied and the control will be just with a single circulation in two steps:
Wait and Weight Method
Step 1
Replacing the original fluid in the drill string with the new fluid circulating until the drill bit. Start pump and bring the pump speed until the slow circulation rate, keeping the circulating pressure according the table “Pressure versus Pumped Strokes”, starting with the Initial Circulating Pressure (ICP) and ending with the Final Circulating Pressure (FCP).
ICP = SIDPP + Circulating Pressure @ Slow Circulating Rate (recorded previously).
FCP = Pressure(@ scr) x New Fluid Density / Original Fluid Density
Vertical Wells
On vertical section, the rate “pressure drop / stroke” is constant and the calculations can be made in 10 steps.
Directional Wells
On deviated section, starting on Kick-Off Point (KOP), the rate “pressure drop / stroke” is not constant. The calculations will consider the steps by 100 strokes each.
Step 2
Continue the circulation with the new fluid to fill the all annular until the surface keeping the circulating pressure constant equal to FCP – Final Circulating Pressure.
Operational Limits
It is very important to monitor operational limits during the circulation to avoid fracture of the formation, usually at the shoe depth of the last casing.
The advantage of the “Wait and Weight” method is to provide a lower resultant pressure at the shoe depth before the gas reaches the shoe depth, that is, when the new fluid passes through the drill bit, increasing the hydrostatic pressure in the annulus before of the gas to reach the shoe depth.
Conclusion
The Wait and Weight method is advantageous when the rig has already the new fluid available to immediate circulation. Normally the new fluid need a lag time to be prepared. (1) On well closed, an influx of gas is moving up continuously and pressurizing the borehole all the time. (2) The calculations to control directional wells are relatively complex.
If it is not possible for the new fluid to reach the annulus before the gas reaches the shoe depth, due to (1) the lag time to prepare the new fluid or (2) the volume of the drill string is greater than the volume of the annulus above the gas until the shoe depth or (3) the difficulty to calculations on directional wells or (4) formations with low fracture pressure on deepwater for example, it is recommended choose the “Driller’s Method” to start immediately after the shut-in the well, holding the circulation pressure equal to Initial Circulating Pressure until the circulation of the total volume of the annulus and to replace the fluid only in the second circulation of this method.
I hope that this simple explanation about the Wait and Wait method on directional wells helps on choicing the method most efficient.
Well Control Methods apps: |
|||||||
|
Well Control Worksheets apps: |
||||||
|
Visit our Portfolio on the App Store
for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
Visit our website for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
New App Directional Drilling Hydraulics
Directional Drilling Hydraulics
Designed for iPhone and iPad
Now available on the App Store
The Directional Drilling Hydraulics provides to directional drillers, drillers, tool pushers, engineers, chemists, students and other professionals in the petroleum industry a productivity tool helpful in drilling of oil wells for hydraulic calculations on directional and horizontal wells, optimization of the penetration rate and useful to help on the decision on selection of bit nozzles.
This App can import data files from App “Directional Drilling” and others available in our portfolio on the App Store:
– Directional Drilling
– Drilling Hydraulics 1 and 2
– Drilling Simulator 1, 2 and 3
– Leak-Off Test Simulator
– Kick Game
– Kick Tolerance
– MPD Simulator
– Well Control Methods
– Well Control Simulator
iPhone X version
iPad Version
Visit our Portfolio on the App Store
for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
Visit our website for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
New Apps for Well Control in Workover Operations
New Apps for Well Control in Workover Operations
In development for iPod, iPhone and iPad
(early 2018 on the App Store)
Workover Simulator
This application provides well control simulations on production wells in workover operations with coiled tubing and slickline on landing rigs for training in Oil & Gas.
A surface production well (vertical or directional) is used to practice basic operations like moving the coiled tubing into the tubing string and circulating a lesser density fluid, with density smaller that the formation equivalent density, to put the well in flow (underbalance condition) to well control practices: hydraulics calculations, swabbing (on tripping out) and control methods including static volumetric (lubricate and bleed) and bullheading.
Slickline Simulator
This application provides well simulation on production wells in workover operations with slickline on landing rigs for training in Oil & Gas.
A surface production well (vertical or directional) is used to practice basic operations like moving the slickline into the tubing string with tools to install and to retrieve specific plugs.
These plugs are installed and retrieved in two trips using slickline.
Coiled Tubing Simulator
This application provides well control simulations on production wells in workover operations with coiled tubing on landing rigs for training in Oil & Gas.
A surface production well (vertical or directional) is used to practice basic operations like moving the coiled tubing into the tubing string and circulating a lesser density fluid, with density smaller that the formation equivalent density, to put the well in flow (underbalance condition) to well control practices: volumes and hydraulics calculations, swabbing (on tripping out), etc.
Visit our Portfolio on the App Store
for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
Visit our website for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
Drilling Simulator 3 – Update for the new iPhone X
Drilling Simulator 3
designed for both iPhone and iPad
Drilling Simulator 1:
– Drilling on vertical well, kick detection, shut-in, stabilisation of pressures (sidpp, sicp, kick volume), save to iCloud to import from other app “Well Control Simulator”.
Drilling Simulator 2:
all of drilling simulator 1 PLUS Direcional and horizontal wells, well control using 01 choke and 01 single kick bubble on borehole and graphical analysis.
Drilling Simulator 3 (This App)
all of drilling simulator 2 PLUS:
1 – until 03 single kick bubbles on the borehole simultaneously
2 – standpipe manifold and choke manifold with 02 chokes and straight through
3 – Complications: failures schedule with Random option:
– Mud Pumps 1 and 2 “power end failure” or “fluid end failure”,
– Chokes 1 and 2 “plugged” or “washed”,
– One Drill Bit Nozzle “plugged” or “washed”
New in the next update (version 1.2 – Coming soon):
– Added interface for the new iPhone X
User Guide for iPad | Download PDF (51 MB) |
Visit our Portfolio on the App Store
for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
Visit our website for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
MPD Simulator for iPhone and iPad
MPD Simulator for iPhone, iPod touch and iPad
This app is designed for both iPhone and iPad.
This application provides practical simulations of the Dynamic Well Control on the Managed Pressure Drilling (MPD) operations in the oil field services.
With Managed Pressure Drilling (MPD), when kicks occur, they are typically smaller, contained more quickly, and, in some cases, they may be circulated out through MPD equipment without drilling or circulation interruption.
This simulator is the new project based on the Drilling Simulator 2 available on our portfolio on the App Store, but specifically for dynamic well control on onshore and offshore operations (deepwater).
MPD System on this simulator:
1. RCD – Rotating Control Device
2. Annular Preventer (or Drill String Isolation Tool – DSIT)
3. Automated Choke for CBHP (Constant Bottom Hole Pressure), Constant Drill Pipe Pressure and Constant Choke Pressure.
4. RPD – Rig Pump Diverter
5. BPP – BackPressure Pump
Additional features:
1. Driller Interface based on Pressure Gauge, Weight Indicator, Rotary Torque gauge and Geolograph.
2. Choke Interface based on Hydraulic Choke Digital Panel.
3. Graph in full screen (with background color in black or white) for analysis.
4. Special screen layout optimised for iPhones 6 / Plus and iPad Pro
5. Auto/Manual Control on MPD Choke ONLY.
Note: For well control based on conventional rig choke panel, please buy the “Drilling Simulator 2”.
Other features also available:
A graphical very useful tool for training of roughnecks, derrickmen, drillers, toolpusher, drilling engineers and students in the well control procedures.
– Ability to drilling, kick detection, shut-in, stabilisation of pressures;
– Interactive System: no pre-set methods;
– Ability to apply control methods: Driller’s method, wait and weight, dynamic volumetric and static volumetric (lubricate and bleed);
– Hydraulics and Hydrostatics;
– Behavior of the kick;
– Applied with subsea stack or surface stack;
– Set well with until 4 sections: riser, casing, liner, open hole ;
– Set Drillstring with drillpipe1, drillpipe2, heavy weight, drillcollar1, drillcollar2
View User Guide for iPad (HTML)
Download User Guide for iPad (PDF)
Visit our Portfolio on the App Store
for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
Visit our website for more Oil & Gas apps for iPhone, iPod Touch, iPad and Mac OS X.
You must be logged in to post a comment.