Page 16 of 16

Oil and Gas Apps for iPhone, iPod Touch, iPad and Mac: Improvements to select units of measurement

Oil and Gas Apps for iPhone, iPod Touch, iPad and Mac

New in the next updates: improvements to select units of measurement

Oil & Apps for iOS

The apps are being updated with a new feature to select units of measurement based per parameter instead of selection per unit system. 

This is the best time for suggestions and bug reports.
We are updating all apps with support for iOS 6 and iPhone 5.

On the next weeks, We will submit the new versions of the apps for approval by apple.

– Drilling Simulator
– Drilling Hydraulics
– Drilling Cost
– Well Control Simulator
– Well Control Methods
– Well Control Worksheets
– Kick Tolerance
– Leak-Off Test Simulator
– Leak-Off Test Analyzer
– Directional Drilling Survey

Oil & Gas Apps on the App Store

contact@wellcontrol.com.br
http://www.wellcontrol.com.br

wellcontrol_url.png

Drilling Simulator for iPhone 1.3: iCloud, iOS 6 and iPhone 5 (Coming Soon on the App Store)

Drilling Simulator for iPhone – Introductory Level

New in this update 1.3 (Coming Soon):

1. Sharing data files with iCloud;

2. Added Liner and Drillpipe 2;

3. Support for iOS 6 and iPhone 5;

4. Compatibility with the Apps “Well Control Simulator“, “Well Control Methods“, “Kick Tolerance” and “Drilling Hydraulics“.

iDrillSim_13_01

iDrillSim_13_02

Current Version 1.2:

resized__120x45_available_appstore_icon_

Drilling Simulator – Introductory level provides a graphical very useful tool for training of roughnecks, derrickmen, drillers and students in basic drilling concepts and in the kick detection based on the behavior of the parameters during the drilling an oil well and of the behavior of kick in the well after the shut-in the well.

– Drilling (bit rotation, geolograph, neutral point);

– Hydraulics;

– Kick Detection;

– Hard Shut-in;

– Behavior of kick;

Note: This app NOT allows to control the well after the kick detection and shut-in. 

The simulation ends after the simulations of underground blowout and blowout to surface.

– Use the App “Well Control Simulator” to control the well.

WCS1_170x170_75

– Use the App “Well Control Methods” about methods to Control the well.

wellcontrol_170x170_75

 

iDrillSim_13_03.PNG iDrillSim_13_04.PNG
iDrillSim_10_04.PNG iDrillSim_10_03.PNG
iDrillSim_10_06.PNG iDrillSim_10_07.PNG

 

iDrillSim_10_08A.PNG

iDrillSim_10_08B.PNG

iDrillSim_10_09A.PNG

iDrillSim_10_09B.PNG

Features:

1) Panel with the following parameters: pump pressure, mud pump speed, strokes totalizer, flow rate, mud weight, bit depth, rotary speed, hookload and weight on the bit;

2) Instruments with pointers to the parameters: pump pressure, hookload and weight on the bit;

3) Geolograph with parameters: drillpipe pressure, choke pressure, active volume, percent of flow, rotary torque, drilling rate and flow in, flow out.

4) Panel with alarms: pump failure, vol high, flow high, bop failure and bop status;

5) Well Config, Circulation Options, Set Alarms, Graph Limits, X-times faster, Pause/Continue, Restart, Send by email, about and Hydraulics;

6) set drillstring with drillpipe, heavy-weight and drillcollar;

7) Select floating rig or land rig;

8) Select unit systems: International, field1 (imperial) and field2 (mix);

9) set fluid parameters: mud weight, plastic viscosity, yield point and initial gel;

10) Select rheological models: Power or Bingham;

11) Set gradients: fracture and temperature;

12) Set jet nozzles or fixed TFA;

13) Set choke parameters and BOP test pressure;

14) Set Surface circulation volume;

15) Set surface circulation equipments (mud pump and lines);

16) Set four formations to drilling (height, pore gradient, fluid density and sof/hard);

17) Save configuration to data files;

18) Select circulation options: drillpipe -> Riser, Kill -> Riser, Close/Open (Hard shut-in) the well;

19) Set alarms: pit gain, flow rate out, max pump pressure and max pump power;

20) Register the kill line losses and pump pressure at the kill speed;

21) show the well with drillstring and neutrl point and show the drillbit on rotating;

22) Show schematic of well with drillstring, kick and neutral point (%);

23) Adjust pump speed, weight on the bit and rotary speed to drilling until kick detection;

24) Shut-in the well using hard method;

25) Register shut-in drillpipe pressure (SIDPP) and choke pressure (SICP) and gain volume;

26) behavior of the kick: keeping the well closed and keeping the well opened;

27) Simulations: Underground Blowout at casing shoe and blowout with failure of bop;

28) Capacities and Volumes calculations;

29) Hydrostatic and critical pressures calculations;

30) Hydraulics calculations;

 

wellcontrol_url.png

contact@wellcontrol.com.br

www.wellcontrol.com.br

Leak-Off Test Simulator for iPhone, iPod Touch and iPad 1.1 now available on the App Store

Leak-Off Test Simulator

LOTSim2_Icon_256

 for iPhone and iPod Touch  for iPad
resized__120x45_available_appstore_icon_ resized__120x45_available_appstore_icon_

New in this update:  Sharing data files with iCloud and several improvements

This app provides a graphical very useful tool for training of Technicians, Drillers, Toolpushers, Drilling Engineers, Students and others professionals of the oil & gas industry to simulate leak-off test and more: hydraulics, hydrostatic, capacities and volumes, ability to select unit systems: Metric, Si, Imperial and Field (mix), very useful for filling well control worksheets.

About the Leak-off Test on drilling operations:
A test to determine the strength or fracture pressure of the open formation, usually conducted immediately after drilling below a new casing shoe.
Initially, pumping fluid into the borehole results in volumetric compression of the drilling mud column and elastic expansion of the casing string plus rock around the borehole. As the pressure in the borehole increases, the leak-off pressure (LOP) is reached when the relationship between pressure increase and volume of fluid pumped deviates from linear. This occurs when fluid begins to diffuse into the formation at a more rapid rate as the rock begins to dilate. Generally, a LOT is a test that finishes immediately after LOP is reached.

Features: 

1) Panel with the following parameters: pump pressure, choke pressure, mud pump speed, strokes totalizer, flow rate, mud weight and volume;
2) Intuitive graphical interface: Instruments with pointers to the parameters: pump pressure, choke pressure and open/close hydraulic choke;
3. Graph Options:
– Pressures Pump / Choke and Volume Pumped versus Pumping Time;
– Pressures Pump/ Choke and Pumping Time versus Volume Pumped;
4) Panel with alarms: pump failure, bop failure and bop status;
5) Toolbar with buttons: Data File, Well Config, Restart, Ranges, Set Alarms, Graph Limits, Pause/Continue, Restart, Set BOP, Send by email, about;
6) Set drillstring with drillpipe1, drillpipe 2, heavy-weight, drillcollar1 and drillcollar2;
7) Select floating rig or land rig;
8) Select unit systems: Metric, SI, field1 (imperial) and field2 (mix);
9) set fluid parameters: mud weight, plastic viscosity, yield point and initial gel;
10) Select rheological models: Power or Bingham;
11) Set gradients: absorption and fracture;
12) Set jet nozzles or fixed TFA;
13) Set choke parameters and BOP test pressure;
14) Vertical or Slant Well Type (KOP, TVD and Measured Depth);
15) Set surface circulation equipments (mud pump and lines);
16) Save configuration to data files;
17) Select circulation options: drillpipe -> riser and drillpipe -> choke, Close/Open (Hard shut-in) the well;
18) Reset alarms: pump failure: max pump speed, max pump pressure and max pump power;
19) Register the pressures at the kill speed ;
20) Show schematic of well with drillstring and riser, casing, liner and open hole;
21) Shut-in the well using hard method;
22) Circulation on slow rate (kill speed);
23) Useful for filling of Standardized Kill Sheets for Well Control;
24) Useful for Filling of Previous Recorded Sheets;
25) Analize of the Choke Line effect in Maximum Choke Pressure;
26) Analize of the Effect of porosity and permeability on absorption curve;
27) Simulation of the Leak-Off Test operation and Graphical Analize of the Leak-Off Test
28) Capacities and Volumes calculations;
29) Hydrostatic and critical pressures calculations;
30) Hydraulics calculations;

Basic Exercise:
1. Close BOP and Choke;
2. Set Mud Pump Speed;
3. Monitor the Choke Pressure;
4. When the pressure deviates from linear, stop the mud pump;
5. Wait until the choke pressure stabilize;
6. Tap on graph to obtain data;
7. Open choke to bleed until choke pressure to zero;

Notes:
1. Set fracture gradient > absorption gradient;
2. The Absorption curve is function of porosity and permeability.
3. Tap with finger and moving it in the graph area to obtain Choke Pressure,
Equivalent Density, Equivalent Gradient, Volume Pumped and Pumping Time.

For iPhone and iPod Touch:

LOT1_11_01
LOT1_11_08

For iPad:

LOT2_11_01
  wellcontrol_url.png

 contact@wellcontrol.com.br

Updates to Leak-Off Test Analyzer for iPhone, iPad and Mac OS X: iCloud Support

Leak-Off Test Analyzer

LOT3_Icon_256

for iPhone and iPod Touch version 1.2   for iPad version 1.2    for Mac OS X  (soon version 1.2)
Available on the App Store Available on the App Store Available on the Mac App Store

New in the version 1.2Sharing Data Files with iCloud.

This app provides for Technicians, Drillers, Toolpushers, Drilling Engineers, Students and others professionals of the oil industry a very helpfull tool to analysis and use during the performing of the leak-off test in wellsite.

About the Leak-off Test on drilling operations:

A test to determine the strength or fracture pressure of the open formation, usually conducted immediately after drilling below a new casing shoe.

Initially, pumping fluid into the borehole results in volumetric compression of the drilling mud column and elastic expansion of the casing string plus rock around the borehole. As the pressure in the borehole increases, the leak-off pressure (LOP) is reached when the relationship between pressure increase and volume of fluid pumped deviates from linear. This occurs when fluid begins to diffuse into the formation at a more rapid rate as the rock begins to dilate. Generally, a LOT is a test that finishes immediately after LOP is reached.

Features: 

1. Intuitive graphical interface;

2. Ability to work with multiple files;

3. Set ranges for graph;

4. Graph Options:

– Choke Pressure and Volume Pumped versus Pumping Time;

–  Choke Pressure and Pumping Time versus Volume Pumped;

5. Data edition (add, edit/save, insert, remove);

6. Ability to send screenshots by email;

7. Ability to print via AirPrint

8. Tap with finger and moving it in the graph area to obtain Choke Pressure,

Equivalent Density, Equivalent Gradient, Volume Pumped and Pumping Time.

 

For iPhone and iPod Touch

LOT1_12_01 LOT1_12_02
LOT1_12_03 LOT1_12_04
LOT1_12_05 LOT1_12_06

For iPad

LOT2_12_01
LOT2_12_02
LOT2_12_03
LOT2_12_04

For Mac OS X

LOT3_12_02
LOT3_12_03
LOT3_12_04
wellcontrol_url.png

contact@wellcontrol.com.br

http://www.wellcontrol.com.br